National Repository of Grey Literature 5 records found  Search took 0.01 seconds. 
Preparation for the implementation of administrative buildings Palmovka Park
Boucník, Jan ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
The diploma thesis deals with the preparation of the construction of Palmovka Open Park III administrative building. It contains a technological regulation for drilled piles, technological regulation for reinforced concrete monolithic constructions, broader transport routes, study of the implementation of the main technological stages, design of building machines and mechanisms, control and testing plan for drilling piles and reinforced concrete constructions, risk and measures, time and financial plan, calculation according to THU, drawing of site equipment, cycle, timetable, item budget, selected technological details.
Construction technology project of a residential park in Olomouc
Horák, Matouš ; Nečasová, Barbora (referee) ; Doubek, Rostislav (advisor)
The subject of the work is the construction and technological project of a residential park in Olomouc. Part of the thesis is a technical report on the construction technology project, which is followed by a study of the main technological stages of the construction object. Furthermore, part of the work includes solutions for wider relations of transport routes and the coordination situation of the construction. I designed the equipment of the construction site for the rough construction of the first stage of construction, including the main construction machines and mechanisms, the time and financial plan for all objects, which is followed by a detailed overall time plan for the realization of the main construction object. Next, itemized budgets with measurement statements were processed. Another part of the work is a plan to secure material resources for specific types of work and objects. A technological regulation with an inspection and test plan for monolithic vertical and horizontal structures and a health and safety plan was prepared. A fire safety solution for the entire building was also developed. Finally, an indicative calculation of the entire building was processed according to the technical and economic indicators for the current year.
Construction Technology Project of University of Tomáš Baťa in Zlín
Krištof, Marek ; Novotný, Michal (referee) ; Venkrbec, Václav (advisor)
The subject of my diploma thesis is selected parts of the construction technology project of Tomas Bata University in Zlín. The content of the work is mainly elaborated technological regulation for making the monolithic ceiling shell of the main aula of the building, processing of the control and test plan and drawings of the ceiling shell. Next, I worked on the design of suitable transport routes to the construction site, the processing of the studies of the implementation of the main technological stages, the design and the processing of the drawings of the construction site, which varies in time depending on the progress of the technological stages, the design and assessment of the lifting mechanisms and machines, time and financial plan, the timetable for the rough construction and the main technological stages, budget of the rough construction, health and safety at work.
Construction Technology Project of University of Tomáš Baťa in Zlín
Krištof, Marek ; Novotný, Michal (referee) ; Venkrbec, Václav (advisor)
The subject of my diploma thesis is selected parts of the construction technology project of Tomas Bata University in Zlín. The content of the work is mainly elaborated technological regulation for making the monolithic ceiling shell of the main aula of the building, processing of the control and test plan and drawings of the ceiling shell. Next, I worked on the design of suitable transport routes to the construction site, the processing of the studies of the implementation of the main technological stages, the design and the processing of the drawings of the construction site, which varies in time depending on the progress of the technological stages, the design and assessment of the lifting mechanisms and machines, time and financial plan, the timetable for the rough construction and the main technological stages, budget of the rough construction, health and safety at work.
Preparation for the implementation of administrative buildings Palmovka Park
Boucník, Jan ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
The diploma thesis deals with the preparation of the construction of Palmovka Open Park III administrative building. It contains a technological regulation for drilled piles, technological regulation for reinforced concrete monolithic constructions, broader transport routes, study of the implementation of the main technological stages, design of building machines and mechanisms, control and testing plan for drilling piles and reinforced concrete constructions, risk and measures, time and financial plan, calculation according to THU, drawing of site equipment, cycle, timetable, item budget, selected technological details.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.